Transactions · Capability

Payment switch development, built to be certified.

An authorisation switch is a small amount of logic wrapped in a very large amount of failure handling. The logic is a few weeks. The failure handling is the project.

Request a switch auditAll Transactions capabilities

The problem

Most switches we are called to look at in India were correct when they were written. What changed is the volume, the number of rails, and the number of teams who now depend on behaviour nobody wrote down.

The symptom is usually the same: it holds on an ordinary day and degrades on the days that matter. In India that means festival peaks, salary dates, the evening of a sale. The failure is rarely CPU — it is a timeout budget that was never agreed, a retry that amplifies load, or a rail that answers slowly rather than failing.

Reference architecture

What this actually contains.

ACCEPTANCESWITCH CORERAILSSETTLEMENTTerminal & SoftPOSCheckout & SDKIdempotent intakeAuthorisation state machineRail selection & routingIn-line risk scoringUPI via NPCIIMPS / NEFT / RTGSCard schemesUTR-keyed matchingEvent-sourced ledgerException workflow

The two highlighted blocks are where volume exposes design debt. They are also the two usually scoped last.

What we build

Scope of a typical engagement

  • Authorisation state machine with explicit timeout budgets per rail
  • ISO 8583 to ISO 20022 migration, preceded by a field-level audit
  • Rail selection and routing, with success-rate feedback
  • Idempotency and replay safety across the whole path
  • In-line risk scoring that fails open or closed by policy, not by accident
  • Rail adapters behind a stable interface, so a new PSP is a week not a quarter
  • UPI switch implementation against the current NPCI specification
  • Shadow-mode migration harness and certification evidence
What we don't do

Said plainly

  • We do not sell a switch licence. You own what we build, source and all.
  • We are not a PSP and do not hold funds. You bring the licences and the rail relationships.
  • We do not run your production unless you buy a managed-service engagement separately.

A page that says what we do not do is worth more to you than one that claims everything.

Integration points

Named systems, not categories.

LayerWhat we integrateNotes
Domestic railsNPCI UPI 2.0 · IMPS · NEFT · RTGSRail-specific timeout and retry semantics differ more than the specs suggest
Card schemesRuPay · Visa · MastercardAuthorisation, tokenisation, chargeback hand-off
Message formatsISO 8583 · ISO 20022We have migrated between these — ask for the field-audit note
PSPsAdapter pattern, provider-agnostic corePSP specifics never leak into routing or orchestration
DownstreamSettlement engine · ledger · analyticsEvent contract agreed before the core is written

How it runs

Shape of the engagement.

Week 0–3

Audit & scope

Field-level audit of the current system, timeout and retry mapping, written scope. Fixed fee. Yours whether or not we continue.

Week 4–20

Build

Core, adapters, risk hook, settlement contract. Fortnightly demos against replayed production traffic, not synthetic load.

Week 16–28

Shadow & cut-over

New switch runs in shadow until it agrees with the old one, then rails move across one at a time.

Durations are indicative and depend on the audit. We do not quote a date before reading the system.

Common questions

Before you ask.

Can you migrate us without an outage?

Shadow mode until the two systems agree on live traffic, then rail-by-rail cut-over with a tested rollback. Nobody should learn about a switch migration from their customers.

How do you test peak behaviour?

Replayed production traffic at multiples of your observed peak, with rails deliberately degraded rather than failed. Slow is harder than down, and slow is what actually happens.

Start with the audit, not the rebuild.

Three weeks, fixed fee, written findings. Most clients discover the problem is narrower than they feared.